HMS Temeraire – Athletics Track Refurbishment.

Victory for Sustainability:

McArdle Sport Tec & Polytan deliver the UK’s first Eco-Friendly Athletics Track.

McArdle Sport Tec partnered with Polytan to deliver a revolutionary sustainable non-porous ‘Rekortan Gel GT’ athletics track surface at Portsmouth’s Naval Base HMS Temeraire Victory Stadium, the first of its kind in the UK

Rekortan Gel GT’s advanced gel foundation replaces 60% of the traditional materials with renewable raw materials; a major advancement in reducing environmental impacts when compared to traditional athletics track infrastructure.

Polytan’s new bio-based system is certified by World Athletics, offering an environmentally responsible choice, whilst improving performance. By replacing traditional styrene-butadiene rubber (SBR) granules with a renewable bio-based gel, the Rekortan Gel GT system saved over fifty tonnes of SBR, significantly reducing the environmental impact whilst delivering a high-quality performance track for athletes.

The installation process of the Rekortan Gel GT system also contributes to its sustainability. Its fully poured, self-levelling application reduced construction time by two weeks compared to conventional methods, which in turn lowered the carbon emissions associated with machinery and site operations.

In addition to the environmental advantages, the new 7-lane, 400m track also features Polytan’s SMART timing gates, a cutting-edge performance diagnostic system which captures precise data like speed, distances, and split times, a technological innovation. This state-of-the-art technology provides athletes with precise insights to elevate their training and performance.

During installation, permanent magnets were embedded within the track, the SMART system requires no maintenance and enhances athletes’ training experience by providing immediate, accurate performance feedback.

Together McArdle and Polytan are honoured to deliver this groundbreaking project which aligns with SAPCA’s sustainability values, reinforcing our commitment to sustainable sports infrastructure through innovative technology. Our collaboration represents significant changes towards more environmentally responsible construction practices and a sustainable future.

“We were extremely pleased with the work delivered on the Royal Navy’s one-of-a-kind gel-based athletics track project. From the outset, McArdle Sport Tec demonstrated a high-level of professionalism, clear communication, and a strong understanding of our unique requirements.

All key milestones were met on schedule, and the team remained responsive and solutions-focused throughout the installation. McArdle’s attention to detail and commitment to quality ensured that the final athletics track surface not only met but exceeded our expectations.

I would confidently recommend their services to anyone seeking a reliable contractor capable of delivering specialised, high-quality projects on time.”

S. Lockton Project Manager KBS Maritime

Our Sports Surfaces

From concept and planning to design and construction, McArdle Sport Tec delivers a seamless, fully integrated service tailored to your requirements.

Similar Case Studies

Discover more of the successful projects our McArdle Sport Tec team has been involved in.

ATR Pirbright

University Of Birmingham

XVII Commonwealth Games

Premier League Football Club – Wolverhampton Wanderers

McArdle Sport Tec carry out the indoor 3G pitch refurbishment at the Wolves Academy Arena.

Situated at the Sir Jack Haywards Training Ground also known as Compton Park; McArdle Sport Tec was honoured when we were awarded our fourth artificial turf sports pitch project with the Premier League club.

Renowned for their exceptional training facilities, Wolverhampton Wanderers Training Ground has been awarded the Category One status, the highest distinction in the Elite Player Performance Plan (EPPP) which is extremely hard to achieve. Academies are independently audited and given a Category status of 1 to 4, with 1 being the most elite

Indoor 3G Pitch:

In 2014, McArdle installed the indoor 3G pitch at the Wolves Academy Arena which is situated within Compton Park; the artificial turf pitch had been used extensively for coaching and nurturing young footballers at the Academy; but after 10 years of intensive use the old TigerTurf Soccer Real Turf was due for resurfacing.

It took 18 days for McArdle to undertake the refurbishment, resurfacing the pitch with TigerTurf’s Premier Pro 50 artificial turf system.  We were delighted to hand the facility back to the club in June with minimal downtime and disruption to the Academy’s classes and schedule.

3G Football Pitch:

In addition to the indoor pitch, McArdle Sport Tec also installed the full-size 3G turf pitch infield an existing athletics track located at Wolves Training Ground at Compton Park. We originally installed the synthetic football pitch in 2009 and were appointed in 2020 by Wolves to refurbish the 3G football pitch with TigerTurf’s Premier Pro 50mm carpet.

Timeline:

2009 – McArdle installed the outdoor full-size 3G pitch at Compton Park

2014 – McArdle install the indoor full-size 3G pitch and outdoor tennis courts at the Wolves     Academy Arena (Compton Park)

2020 – McArdle refurbish the full-size 3G pitch at Compton Park 

2024 – McArdle refurbish the indoor 3G pitch at Wolves Academy Arena (Compton Park)

Our Sports Surfaces

From concept and planning to design and construction, McArdle Sport Tec delivers a seamless, fully integrated service tailored to your requirements.

Similar Case Studies

Discover more of the successful projects our McArdle Sport Tec team has been involved in.

Dorothy Hyman Sports Centre

The Racecourse Playing Fields

Ysgol Gymraeg Gwynllyw

University of Birmingham Commonwealth Games

McArdle Sport Tec sets the gold standard for elite hockey pitch facilities.

2022 will be remembered within the sports industry for hosting the Commonwealth Games in Birmingham; McArdle and partners TigerTurf, will remember 2022 for a whole different reason.

In the Spotlight:

We were honored to be involved in our second Commonwealth Games sports facility project.

McArdle installed the athletics track for the Manchester 2002 Commonwealth Games with Laing O’Rourke. In 2021, the University of Birmingham appointed McArdle Sport Tec with partners TigerTurf to extend and refurbish the existing water-based hockey pitches at Bournbrook in preparation for the 2022 Commonwealth Games. The elite water-based hockey pitches hosted the televised competition matches throughout the whole games.

McArdle & partners TigerTurf originally reconstructed the water-based hockey pitches in 2018, alongside the installation of ten new tennis courts and a World Rugby Regulation artificial grass pitch. Although the existing water-based surfaces were still in fantastic condition, slight adaptations were required to permit the facilities to host the games, involving extension of the run-off areas and changing the existing run-offs from red to blue to meet with FIH Category 2 standards.

Victorious in the finals, England Women’s hockey team defeated Australia bringing home a first-ever Commonwealth Games Gold medal with the England Men’s team winning Bronze against South Africa.

Built for success:

The FIH Global accredited TigerTurf WETT Pro Reflex Blue surface was specifically selected to ensure not only the carpet provided the optimum competition playing conditions, but the surface provided a better contrast against the ball for the televised games ensuring minimal glare and reflection.

WETT Pro is an elite water-based hockey system manufactured by TigerTurf in Kidderminster, just fifteen miles from the University. WETT Pro offers unparalleled performance and durability

McArdle Sport Tec was incredibly excited not only be working with long-standing clients The University of Birmingham, but to have our projects featured within world-renowned Commonwealth Games is an honor and a project which we will be proud to showcase for years to come.

Timeline:

2009: McArdle refurbish existing facilities to provide 2Nr water-based hockey pitches.

2017: McArdle & TigerTurf appointed to reconstruct and reorientate 2nr water-based hockey pitches, installation of 1nr World Rugby Reg 22 Artificial Grass Pitch and 10nr Tennis Courts

2017: McArdle appointed to construct a new 8-lane porous athletics track with natural turf infield

2021: McArdle & TigerTurf appointed to resurface and extend the existing water-based hockey pitches in preparation for the 2022 Commonwealth Games

[/vc_row]

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Our Sports Surfaces

From concept and planning to design and construction, McArdle Sport Tec delivers a seamless, fully integrated service tailored to your requirements.

Similar Case Studies

Discover more of the successful projects our McArdle Sport Tec team has been involved in.

Chesham Grammar School

Alsager Sports Pitches

Marden Hockey Club

McArdle excel at Hockey Pitch Refurbishment for St George’s College

Home to nearly 1100 pupils, prestigious co-educational independent school St George’s Weybridge in Surrey, approached McArdle Sport Tec after discovering that we had refurbished the water-based hockey pitch at HMS Temeraire, Portsmouth through a chance encounter whilst travelling to Brighton on the train.

We were delighted when the college appointed McArdle Sport Tec to carry out remedial foundation works and resurface the existing hockey pitch and training area which is shared with Premier League hockey club “The Old Georgians.”

St George’s College requested a bespoke maroon yarn matching the schools specific brand guidelines. Working with artificial carpet manufacturers TigerTurf, our team created the bespoke coloured yarn to create these iconic and one of kind run off areas with the addition of the school’s emblem.

As sports surface experts, our team specialise in innovative designs and pioneering construction methods. Our experienced team deliver a truly turnkey solution, from initial conception through to planning, design,
construction and completion.

Contact us to discuss your project further.

IMG_1500-resized-1536x1024
st georges hockey
st georges

Excellent advice and support and have always been forthcoming in communicating procedures and timeframes.

“We have been delighted to work with McArdle Sport Tec on the refurbishment of our main hockey pitch at St George’s College.

Our aim was to install a first-class hockey facility for use by the College and Old Georgians Hockey Club and McArdle have delivered.

Throughout the design, costing and build process they have provided excellent advice and support and have always been forthcoming in communicating procedures and timeframes.

The pitch has already hosted several high-profile events and has been praised by those using the facility for its performance, playability, and aesthetics.”

Rob Deacock Grounds Manager – St George’s College

Our Sports Surfaces

From concept and planning to design and construction, McArdle Sport Tec delivers a seamless, fully integrated service tailored to your requirements.

Similar Case Studies

Discover more of the successful projects our McArdle Sport Tec team has been involved in.

Chesham Grammar School

Alsager Sports Pitches

Marden Hockey Club

3G PITCH REFURBISHMENT COMPLETED AT CYNCOED CAMPUS

After a competitive tendering process Cardiff Metropolitan University and Managing Consultants GeoTurf Ltd appoint McArdle Sport Tec to fulfil the artificial sports pitch resurfacing works.

We were thrilled to hand over the recently refurbished 3G pitch at Cyncoed Campus for Cardiff Metropolitan University which took 4 weeks to complete.

McArdle Sport Tec have a historical professional working relationship with Cardiff Metropolitan University, which extends beyond the 3G football Pitch; in 2017 we reconstructed their six lane 400m athletics track with the inclusion of a 3G World Rugby Reg 22 pitch infield, prior to this, McArdle also resurfaced the existing hockey pitch in 2014.

Our team know the campus facilities particularly well, we were delighted to return after 8 years to refurbish the 3G artificial FIFA Quality Pro pitch which McArdle Sport Tec originally constructed in 2014.

The redundant TigerTurf Soccer Real XQ carpet was uplifted, then replaced with another TigerTurf FIFA Quality Pro product: Atomic Pro 50. McArdle Sport Tec have also installed Atomic Pro 50 at Dorchester Town FC and Chelmer Valley High School.

The redundant carpet was disposed responsibly through a sustainable and environmentally considerate resolution through one of our well-established sub-contractors, avoiding any product ending up in landfill.

Our clients Cardiff Metropolitan University were pleased with the completed 3G pitch and furthermore impressed with the minimal disruption and impact imposed within the venue including the minimal downtime due to the efficient contractual management from McArdle’s team.

This 3G Pitch facility has received the FIFA Quality Pro certification; to date there are currently only 36 pitches across Great Britain recorded with this status.

cardiff met refurb
cardiff met

Our Sports Surfaces

From concept and planning to design and construction, McArdle Sport Tec delivers a seamless, fully integrated service tailored to your requirements.

Similar Case Studies

Discover more of the successful projects our McArdle Sport Tec team has been involved in.

Dorothy Hyman Sports Centre

The Racecourse Playing Fields

Ysgol Gymraeg Gwynllyw

HMS Temeraire – Portsmouth

McArdle Sport Tec awarded prestigious water-based hockey pitch refurbishment at the Alan Walker Stadium.

Home to the Royal Navy School of Physical Training, HMS Temeraire is overlooked by the iconic Spinnaker Tower in thriving Portsmouth town. This historic naval base is responsible for training members of the Royal Navy to become physical training instructors.

Originally built in 1995, the ‘Alan Walker Stadium’ water-based hockey pitch is the Royal Navy and UK Armed Forces’ most prestigious hockey facility.

The water-based pitch had previously been resurfaced in 2006, but due to reoccurring algae and moss complications and the carpet nearing the end of its lifespan, McArdle Sport Tec were delighted to have been awarded the contract by Bryburn Construction and BAE Systems.

Works started in July to remove the existing carpet and shockpad, revealing underlying structural issues with the engineered base layer which needed immediate remediation works.

After repairs to the engineered base, a new shock pad layer, the pitch was rejuvenated with a new colour theme, replacing the old outdated green water-based carpet with bright blue infield with red run offs which reflects the Royal Navy colours, with the addition of bespoke Royal Navy Hockey and Royal Navy Hockey Association logo mats to complete the look.

McArdle Sport Tec are well accustomed to the strict and compulsory regulations and security checks required by the Ministry of Defence to ensure cooperative collaboration with sensitive construction projects on high profile sites.

To discuss your pitch resurfacing requirements or if you are looking to install a new hockey pitch facility contact us on 01491 827810 or email us at enquire@mcardlesport.co.uk.

The transformation is outstanding

“I was honoured to be part of the major refurbishment works for the Royal Navy and HMS Temeraire. The transformation is outstanding, the finished pitch looks outstanding.”

Barry Jacobs – Contracts Manager – McArdle Sport Tec

Our Sports Surfaces

From concept and planning to design and construction, McArdle Sport Tec delivers a seamless, fully integrated service tailored to your requirements.

Similar Case Studies

Discover more of the successful projects our McArdle Sport Tec team has been involved in.

Chesham Grammar School

Alsager Sports Pitches

Marden Hockey Club

Eton College, Windsor – Hockey Pitch Resurfacing

McArdle Sport Tec were delighted to be appointed as Principle Contractor for a second contract at Eton College.

Eton have two established full-sized synthetic hockey pitches; the first sand-dressed hockey pitch was installed in 1999 and the second additional sand dressed pitch was installed in 2002.

McArdle successfully won a tender to resurface the 2nd hockey pitch in 2015 – at this point the surface was 13 years old. We were delighted to return back to the college to resurface the original artificial hockey pitch which was completed and handed over in July 2018.

Our recent hockey pitch resurfacing took a total of 8 days, lifting and removing the existing synthetic hockey carpet and replacing it with TigerTurf Evo Pro in Dark Green for the main playing area, with an accentuating Light Green surround, complimented by the Eton College coat of arms embedded in the sand dressed pitch entrance.

Michael Chapman from Eton College quoted:

“All the work has been completed very quickly and efficiently and everyone who worked on the hockey pitch installation has been extremely friendly and helpful. Thank you for all the work you have done for this sand dressed hoceky pitch , I look forward to working with McArdle again in the future.”

Extremely friendly and helpful

“All the work has been completed very quickly and efficiently and everyone who worked on the job has been extremely friendly and helpful. Thank you for all the work you have done for this project, I look forward to working with McArdle again in the future.”

Michael Chapman from Eton College

Our Sports Surfaces

From concept and planning to design and construction, McArdle Sport Tec delivers a seamless, fully integrated service tailored to your requirements.

Similar Case Studies

Discover more of the successful projects our McArdle Sport Tec team has been involved in.

Chesham Grammar School

Alsager Sports Pitches

Marden Hockey Club