WE WERE APPROACHED BY MARLBOROUGH COLLEGE TO RECONSTRUCT AND REFURBISH TWO EXISTING FULL-SIZE ARTIFICIAL PITCHES.

The artificial turf was laid upon a 15mm in-situ shock pad with an engineered macadam base layer.
We carefully selected TigerTurf UK’s EvoPro carpet for both pitches to meet FIH standards.
Marlborough collegespecified a blue hockey surface surrounded with a green run-off area.
The scope of works involved removing the old redundant synthetic carpet on each hockey pitch; designing and installing a new drainage system, new sub-base layers and replacing the kerbing.
To complete the project, the existing floodlighting system was removed and replaced with an 8 column, ultra-low glare 300 LUX system. The fencing was replaced and re- aligned, and new kickboards were installed.