We were approached by Marlborough College to reconstruct two of their existing near full-size artificial pitches.

The turf was to be laid upon a 15mm in-situ shockpad upon an engineered macadam base.
To meet FIH standards we carefully selected TigerTurf UK’s EvoPro carpet for both pitches.

The college had specified a blue playing surface surrounded with a green run-off area.

The project involved removing the old carpet on each pitch, designing and installing a new drainage system, designing and installation of a new sub-base and replacing the kerbing. To complete the project, the existing floodlighting system was removed and replaced with an 8 column, ultra-low glare 300 LUX system. The fencing was replaced and re-aligned and new kickboards were installed.

The project totalled approximately £640,000 and work was finished in the summer of 2013, on-time and within budget.


We offer a comprehensive service from conception and planning through to design and construction.